Freeze The Build Before You Count

Start with one approved build for the campaign. Give the keychain a buyer item number and attach the artwork revision, finish, fitting and packing specification.

Record what counts as a complete unit for distribution. In this example, one unit is an assembled logo keychain with its split ring, in its approved single pack.

Keep one sample reference for the shared build. Ask each site to confirm it needs the same item and packaging before you combine its count with other locations.

A later artwork change creates a separate approval decision. Give any site-specific logo or printed insert its own row and ask how it affects setup and minimum quantities.

The MIT procurement team’s promotional product guidance ties approved brand use to supplier coordination. Use your own brand rules to decide who can clear artwork for the shared build.

Once the shape is fixed, use the same request for custom logo keychains for every destination. A single drawing and pack reference make the routing comparison meaningful.

Turn Site Requests Into One Schedule

Ask each site for two dates. Record when staff first need stock at the location and when they expect to finish handing out that allocation.

Name a receiver, receiving address and hours for every line. Record the floor or room when the street address sends deliveries to a shared dock.

In the example below, sites have two distribution waves. A wave describes when a site needs its allocation and can draw from an earlier shipment if it has storage.

Receiving PointWave OneWave TwoTotal Site Allocation
Seattle330 by 8 May210 by 22 May540
Austin210 by 10 May150 by 24 May360
Boston160 by 12 May100 by 25 May260
Seattle Shared Reserve40 by 8 May040
Order Total7404601,200

The three site commitments add to 1,160. Forty reserve units are stored in Seattle under a separate line and count toward the 1,200-unit purchase once.

Put the reserve owner and release rule in the schedule. That person can authorize moving stock to a short location while its original count is still visible.

A green logo keychain sample sits beside three open cartons and a counting sheet.
Separate site commitments from the shared reserve so the factory quotes each complete unit just once.

Ask For Two Quotes On The Same Build

Send the 1,200-unit schedule to the supplier as one request. Ask for a quote to your central dock and a quote to the named sites.

For the hub route, ask for the product count, inbound freight and any destination marking you want on cartons. Price your own handling and onward parcels separately.

For the direct route, ask for quantities, packing and freight by address. State which shipment holds the reserve and which line will pay for its freight.

Ask if the price tier applies to the full production quantity, each version or each separate run. Request the minimum for any distinct printable insert or product build.

Record production releases and delivery legs in separate columns. A split between shipping destinations may still come from one production run.

GS1’s physical location guidance distinguishes deliver-to and invoice-to identifiers. Keep the actual delivery point separate from the billing office on your schedule.

Calculate The Cost Of Each Route

Use the same quantity and approved pack on both quotes. Put freight, local work and any extra dispatch packing on their own lines.

Here is an illustrative quote comparison in US dollars. The assumptions cover one shared setup, the same accepted product and planned delivery groups.

Both quotes deliver each site’s two waves together against its first deadline. The example receivers have room to keep the second wave in its marked group.

Cost ItemCentral Hub RouteSupplier Direct Route
1,200 Packed Keychains1,200 × $2.10 = $2,5201,200 × $2.16 = $2,592
Shared Setup$120$120
Freight To Seattle$180 to the buyer hub$150 including reserve
Supplier Freight To Austin And BostonBuyer arranges after receipt$130 Austin + $150 Boston
Hub Receiving And Sorting$240 additional work at the hub$0 extra hub work
Onward Parcels From The Hub$90 Austin + $75 BostonIncluded in direct freight
Extra Direct Dispatch PackingIncluded in hub figures$60 quoted
Comparable Total$3,225$3,202

Each destination inspects and accepts its cartons under either route. The comparison excludes that common site work and counts the extra sorting at the hub.

Direct delivery costs $23 less on these assumptions. The hub route starts at $2,820 before sorting and onward parcels.

Subtract that $2,820 from the $3,202 direct total. The hub ties at $382 of internal handling and onward freight, and beats direct below that amount.

If your hub can sort and deliver for $300, its total falls to $3,120. It then saves $82, provided the receiving dates also work.

Have your logistics team confirm the onward cost, including each leg that needs a separate parcel. Recalculate the crossover if a supplier revises quantities, a freight charge or setup.

Test Both Routes Against Real Deadlines

Write a usable stock date next to each destination and wave. Work backward through the site’s intake, transit and any hub sorting day.

For example, Austin first needs 210 on 10 May. If its route allows two transit days and one intake day, aim to dispatch by 7 May.

If both onward routes allow the same two transit days, both need dispatch by 7 May. The hub needs the finished order on 6 May for its extra sorting day.

The direct factory quote can still meet the deadline with dispatch on 7 May. Choose a confirmed on-time route first, then compare the totals of the routes that qualify.

Look at calendars and dock availability before you confirm the dates. The site contact can report a weekend closure, a limited dock window or a destination where cartons cannot wait.

Ask the supplier to confirm expected arrivals by location in writing. Agree which person watches each shipment and who can authorize a different route if it slips.

The supplier timeline guide explains how to verify upstream production dates. Keep those dates beside the dispatch plan so a factory delay feeds into each affected delivery leg.

A direct shipment can satisfy a first wave and carry later stock when the site has space. Add a distinct packing group so the receiver can see the later quantity clearly.

Lock Carton Counts And Site Receipts

Give the supplier or hub a final dispatch table with the build revision, destination and quantities per carton. Match the site’s naming conventions before carton labels are printed.

When a carton contains more than one wave, require a visible divider and an inner group count. This lets the receiver confirm the first wave while the rest stays packed.

Ask each site to report cartons received, complete accepted units and any pieces placed on hold. Give them the approved reference photo and the correct schedule version.

If the Austin first shipment comes in at 200 accepted units, record a shortage of 10 against that row. The reserve owner can authorize a dated transfer of 10.

After that transfer, the reserve line shows 30 available. Record whether the Austin shortage stays open with the supplier so a later replacement reaches the right owner.

A receiving tray holds green keychains beside packaged units, an open carton and several plain marker tabs.
Compare the actual contents to that site's dispatch row before applying a reserve transfer.

Record the transfer as ten out of Seattle and ten into Austin. The internal transfer nets to zero across the order.

Close out the original receipts and document any supplier replacement separately. Mark whether the replacement restores reserve stock or covers a remaining site shortage.

Handle A Late Site Change

Suppose Austin needs 20 more units for its second wave before cartons are packed. You could move 20 from the reserve, keeping the full order at 1,200.

The revised schedule shows 380 for Austin and 20 in Seattle reserve. The same product count can change handling, parcel weights or destination packing.

That change assumes the original reserve is still 40. If the previous Austin shortage already used 10 reserve units, this second authorization leaves 10 available.

Have the dispatch owner confirm the revised costs and delivery dates before issuing new carton instructions. Name who will replace the earlier schedule and check printed labels.

If the units have already shipped, record the affected cartons and arrange a separate authorized transfer. Keep the original dispatch evidence with the new transfer record.

Frequently Asked Questions

Can One Site Ask For Different Packing?

Yes. Add the packaging version to that site’s line and ask for separate packing costs and the minimum. If the physical keychain remains common, confirm the supplier can quote it against the shared production quantity.

Should Each Site Pay A Separate Invoice?

Decide before placing the order. One paying office can receive the invoice while several locations receive stock. Ask the supplier to allocate freight and approved charges by location if your accounting team needs that breakdown.

What If A Site Has No Receiving Dock?

Give the supplier the correct delivery point, access hours and a named local contact. Ask for a carton size and carrier service that the receiving team can handle before approving direct delivery.

What If A Location Needs A Small Early Shipment?

Show that request as a dedicated dated row. Ask how pulling that quantity forward changes unit rates, setup, dispatch packing or freight. Confirm which later cartons are reduced to keep the same order total.