Separate Permission From Correction

A one-lot concession records a buyer decision about identified finished goods. It leaves the agreed drawing in force for everything outside that permission.

First establish that the goods differ from an accepted requirement. A preference introduced after production may instead require a commercial design change discussion, with the original agreement kept visible.

Do not confuse a supplier explanation with permission to use the stock. The supplier can investigate the condition while the buyer keeps affected finished pieces on hold.

The supplier corrective action guide addresses cause, correction and recurrence. Closing that investigation does not itself authorize delivery of an out-of-spec medal.

A planned temporary component substitution starts before the affected assembly is made. Here, the goods already exist and their measured condition needs a disposition.

Confirm who can authorize an exception for the intended customer and use. Purchasing should obtain the required technical and customer approvals rather than infer them from a delivery deadline.

If your team lacks that authority, keep acceptance pending. A supplier request, buyer silence or an internal meeting note should not be treated as an agreed concession.

Identify The Finished Stock On Hold

Name the purchase order, medal version, drawing revision and finishing lot before discussing quantities. Include the delivered assembly state and the ribbon allocation for each affected group.

Locate all finished stock that may share the condition. Separate goods at the supplier, in transit, at your warehouse and already issued to another team.

Use confirmed physical counts for each location rather than adding estimates to a finished total. Assign an owner to unresolved counts and keep those quantities unavailable for release.

Distinguish pieces actually checked from pieces placed on hold because they share the production history. A few measured samples cannot establish the count of every affected medal.

If a complete sort is proposed, agree the feature, reference and measurement method first. Record the sorted total and each outcome so the counts can be reconciled.

Keep evaluation specimens within the stock account, including any damaged during review. A specimen used for evidence does not disappear from the purchase order balance.

For shaped diecast medals, identify the actual suspension feature under review. A label such as medal dimension is too broad to define a useful hold.

Mark the physical containers so the proposed exception group remains identifiable during packing. An email naming a lot is insufficient when accepted and held pieces share an unmarked tray.

State The Requirement And Measured Deviation

Copy the relevant drawing characteristic with its units and revision. Then state the observed condition separately, including where and how the measurement was taken.

Check whether the requirement applies before or after finishing. The usable opening in a finished medal assembly may differ from a dimension recorded on an earlier manufacturing stage.

Ask the reviewer to confirm that the measurement addresses the intended feature. An outside width cannot answer a requirement for the clear ribbon opening.

Record the method limitations and any uncertainty relevant to the decision. If the observed difference is not yet established, resolve that evidence gap before proposing a numerical exception.

Flexfab publishes a supplier deviation form identifying specification, observed difference, quantity and approval. Its own requirements and certification statements do not become conditions for your medal order.

Use that distinction between original requirement and requested difference in your own record. Avoid replacing the drawing value with a new number before the responsible buyer has decided.

Preserve photographs and specimen identifiers with the measurement record. A later supplier spreadsheet should remain traceable to the pieces and locations originally examined.

If an earlier report rounded the opening differently, retain the original readings for review. An edited summary must not expand the proposed permitted range without a new technical decision.

Choose Evidence For The Actual Use

Ask what the measured deviation could change in the supplied assembly. A narrower opening may affect ribbon threading, edge contact or the way the medal hangs.

Use the actual approved ribbon construction and connection for that assessment. An easier substitute ribbon cannot establish that the ordered award remains suitable.

Identify which ribbon batches, seams and assembly conditions the evidence represents. The buyer needs a reason before extending a result from one configuration to another.

Choose representative specimens with the technical reviewer, including relevant observed extremes. Record why those specimens address the proposed concession instead of choosing only the easiest pieces to assemble.

Agree the checks and acceptance basis before conducting the comparison. Record threading behavior, visible damage, connector position and other relevant ordered functions without inventing a universal test load.

A successful demonstration is evidence for its stated conditions, not automatic permission to ignore a drawing. The authorized reviewer still needs to consider all applicable customer requirements.

Escalate any unresolved safety, regulatory or intended-use concern to the responsible qualified authority. A quantity limit or discount cannot establish that an otherwise unsuitable award may be used.

If more evidence is required, state exactly what remains unanswered. Holding the identified stock while that question is resolved is a valid disposition at this stage.

A finished medal ribbon opening and its actual sewn ribbon are shown beside a separate approved assembly reference.
Tie the requested exception to the measured feature and the actual ordered assembly; fit appearance alone is not authorization.

Name the connection and ribbon references on each evaluation record alongside the medal specimen. A result without those identities leaves receiving unable to establish which supplied assembly the evidence covers.

Compare The Available Dispositions

Compare rejection and replacement, technically acceptable rework, and a limited concession as separate routes. Record what each route delivers against the outstanding order rather than treating them as interchangeable promises.

For rework, ask how the proposed operation affects the complete finished medal. Enlarging an opening could alter adjacent edges, finish or attachment geometry and therefore needs its own reviewed instructions.

Require suitable evidence from the proposed reworked result before authorizing the affected quantity. Permission to develop that result should remain separate from permission to ship it.

For replacement, identify what happens to the original pieces and which new lot will satisfy the order. Do not count replacement manufacture as an extra customer delivery.

For a concession, define the exact permitted difference and the intended use. Keep every other accepted requirement in force, including identity, assembly and appearance conditions outside the exception.

Ask purchasing to resolve price, additional work and delivery effects with the supplier. A quality disposition should not quietly impose charges or accept a commercial settlement on someone else’s behalf.

If the parties cannot agree a route, record the unresolved issue and keep the relevant hold. The supplier should receive one clear instruction about what may happen next.

Work Through A Finished Lot

Consider a hypothetical order for 800 finished medals from lot L57. An agreed complete sort identifies 320 conforming pieces and 480 with a narrower finished ribbon opening.

The example drawing requires a clear opening of at least 31.5 mm after finishing. The affected pieces measure between 31.1 and 31.3 mm under the agreed method.

These values describe this fictional requirement and result only. They are not standard medal dimensions, approved manufacturing tolerances or recommended allowances.

The buyer needs 180 affected medals with ribbon batch R3 for one identified ceremony allocation. A qualified reviewer evaluates the actual assemblies against the agreed intended-use checks.

The resulting evidence supports only that R3 configuration and the identified opening range. The buyer’s authorized technical and customer reviewers permit consideration of those 180 pieces.

Another 240 affected medals are allocated to ribbon batch R4, which the concession evidence does not cover. The buyer and supplier agree to pursue a reviewed rework route for that group.

The remaining 60 affected originals are rejected for this order and require replacement. Two evaluation specimens remain within that rejected group, so they are not hidden extra consumption.

GroupDisposition In This Example
320Conforming to the original drawing; normal release remains subject to the existing order checks.
180Concession proposed for the identified R3 assemblies and ceremony allocation only.
240Hold for agreed rework and verification against the original requirement.
60Reject and replace; includes the two retained evaluation specimens.

The affected count closes as 180 plus 240 plus 60, totaling 480. No part of the proposed concession clears the R4 group or the rejected originals.

Write The One-Lot Permission

Use a unique concession reference and attach the supporting evidence. Name the drawing requirement that remains unchanged and the precise difference permitted for the stated pieces.

Give the permission a quantity boundary and an expiry with a defined meaning. A dispatch deadline and a receiving deadline are different conditions, so identify which one applies.

In the hypothetical case, concession C12 permits dispatch of the identified 180 R3 assemblies by 20 January 2027. It authorizes no later manufacture or reorder.

Identify the physical group or container references that hold those pieces. A quantity alone cannot prevent someone from selecting 180 different medals from the affected stock.

FieldFilled Concession Entry
OrderPO M800; medal drawing D8 revision 3; finished lot L57.
DeltaClear opening 31.1–31.3 mm instead of the specified minimum 31.5 mm.
Scope180 identified medals assembled with ribbon batch R3; stated ceremony allocation only.
IDsC01–C03 hold 60 permitted R3 assemblies each; total 180 under C12.
ProofReviewed measurement and actual-assembly records; specimen identities retained.
RulesAll other order requirements remain unchanged; no R4 assemblies covered.
ExpiryDispatch no later than 20 January 2027 in this hypothetical schedule.
OwnerNamed buyer technical and purchasing approvals; required customer approval retained.
Limits240 awaiting rework, 60 rejected originals and all future orders.

State how the supplier will identify the concession on packing documents and containers. Send the same reference to receiving before any permitted shipment leaves.

A signature should describe an approved, conditional or denied decision rather than acknowledge receipt alone. Return unanswered conditions to the supplier without representing them as permission.

Explain whether a timely dispatch may arrive after the stated deadline without losing its documented coverage. Receiving should apply the agreed condition rather than guess what the expiry was intended to mean.

Hand Receiving A Specific Release

Give receiving the concession reference, permitted quantity, configuration and shipment identification. Explain the allowed difference so the team does not reject it again or clear unrelated stock.

Keep the 320 conforming medals identifiable from the 180 concession assemblies even if they travel together. Both groups still need the applicable quantity and identity checks.

Use the actual packing list to reconcile what has been dispatched against the permission. Record partial shipments so the supplier and receiver share the remaining authorized balance.

If 100 concession assemblies ship first, only 80 remain available under C12. Those 80 remain subject to the same configuration, evidence and dispatch deadline.

A request to send another ribbon batch or a different ceremony version requires a new decision. Do not relabel that shipment as the unused portion of the existing concession.

For graduation medals, include the actual cohort allocation in the receiving instruction. The buyer must know which group may receive the exceptional assembly.

When receiving finds a condition outside C12, keep that finding separate from the approved difference. Notify the responsible reviewer with the actual identifiers and evidence before distribution.

Four separated medal stock groups sit beside a concession record, with one limited group distinguished from rework and rejected stock.
The permitted quantity must remain separate from conforming pieces, rework holds and rejected originals throughout the handoff.

Identify the containers used for the remaining eighty permitted assemblies after the first partial shipment. The unused quantity is a maximum within C12, not permission to select another unreviewed group.

Reconcile Rework And Replacement

Track the 240 reworked originals by their original identity and reviewed rework instruction. Release them only after the required evidence confirms the result meets the applicable order requirements.

Keep the 60 rejected originals unavailable for customer delivery while replacement is arranged. Their physical disposition and any commercial settlement require a separate recorded agreement.

The new replacement lot supplies 60 conforming medals in this example. That makes the final order delivery 320 conforming, 180 concession, 240 verified rework and 60 replacements.

Those four delivered groups total 800 medals. Across manufacture, 860 physical pieces have existed because the 60 rejected originals remain outside the 800 delivered units.

Record the retained evaluation specimens within those 60 rejected originals until their disposition is agreed. Do not subtract them again or buy two additional replacements without changing the stated balance.

If rework yields a different accepted quantity, reopen the outstanding-order calculation. Record its rejected or held balance before changing the replacement instruction.

For event medal orders, share that updated balance with the distribution owner. A promised replacement quantity is not finished stock available for the event.

Close The Exception Without Changing The Drawing

Close C12 when the permitted shipments and remaining quantities have been reconciled. Retain its evidence and receiving records without turning the exception into the next order specification.

If a quantity remains when the dispatch deadline expires, keep it on hold under the stated conditions. Obtain a new authorized decision rather than extending the date informally.

The order owner should confirm the original drawing revision for future production. A request for a permanent design change needs its own review and cannot be inferred from the concession.

Keep the supplier’s cause investigation linked but separate where one is required. Recurrence prevention may continue after the exceptional finished lot has received its final disposition.

Check that purchasing, receiving and the supplier use the same final count. The closed record should explain both what reached the customer and what happened to excluded physical stock.

Retain the exception reference where later reviewers can find it. It should explain a specific historical delivery, not become a standing permission for the same deviation.

If a later order shows the same condition, assess that stock under its own requirement and authority. Referencing the previous evidence may help review, but C12 supplies no standing acceptance.

Frequently Asked Questions

Can A Discount Replace Technical Approval?

Commercial compensation can be discussed separately, but it does not establish suitability for the intended use. Obtain the required technical and customer decision before treating any affected pieces as releasable.

Does Acceptance Of One Delivery Cover The Remaining Lot?

Only the expressly identified quantity and conditions are covered. Keep later deliveries within that scope and reconcile the remaining permission before each shipment.

What If The Supplier Already Dispatched The Goods?

Identify the shipment and prevent uncontrolled distribution while the responsible team reviews the actual condition. Do not backdate a permission or assume the shipment itself proves buyer acceptance.

Must Every Deviation Be Accepted Or Rejected Immediately?

A hold is appropriate when evidence, authority or affected-stock identity remains unresolved. Name the missing input and next decision owner so the hold has an actionable reason.