How To Compare Quotes For A Bulk Medal Order
Two suppliers can quote different totals for the same medal order. One includes delivery to your warehouse.
Use landed cost to bring both quotes to the same receiving point. Then divide by the awards your team can present.

Define What Counts As One Award
Write one line per award version before requesting a quote. Include the finished quantity and the parts the recipient should receive.
A quote might cover the metal body, an assembled medal, or an assembled medal in a box. Ask suppliers to label the quoted unit.
Specify how many pieces receive engraving, different finishes, or individual packing. If staff will finish the awards later, give that work its own line.
| Quote Unit | Details To Confirm |
|---|---|
| Medal body | Finished metal piece with the required face, reverse, edge and finish. |
| Assembled award | Body plus the agreed attachment and assembly, with all included components named. |
| Personalized award | The agreed assembly plus engraving or other variable work for named units. |
| Ready-to-present award | The approved finished version and presentation pack, with any agreed sorting or labeling. |
State which extras count as spare stock. If they differ from the awards you plan to hand out, keep them in a separate quantity.
If the event combines finishers and award winners, identify both groups up front. A marathon medal example can help you describe the main run.
Price The Mix Of Award Versions
Separate versions by cost drivers, such as body size, finish, or engraving. Give suppliers the count for each combination you actually plan to order.
Ask if a shared outline can use common tooling across tiers. A change in raised wording, size, or shape may need its own setup.

Request a price for each version, even when the supplier gives a blended total. That detail helps you evaluate a change in tier counts.
A wider or thicker body may change the material, finishing work, or pack dimensions. Ask suppliers to show which quoted lines change with size.
If a supplier offers two body sizes, check the packaging and assembly assumptions for both. Record the quote revision for the size you accept.
For several divisions, study a ranked medal family and label your versions clearly. Share the same approved list with every supplier.
Separate Setup From Repeat Charges
Ask for tooling, artwork preparation, and samples on separate lines. Record whether each charge covers one version or the full order.
If your supplier combines setup with unit pricing, ask how a repeat order would be priced. Record the conditions for using the same tooling.
A new event year may change a formed detail or an engraving file. Ask which cost changes if you retain the body and update text.
- Identify the first run charges for common tooling, variant tooling, artwork and samples.
- Record which files or tooling can be used again and any conditions on reuse.
- Ask which costs change when an award title, finish, size or quantity changes.
- List which setup charges recur if you order a short extra run.
- Ask when the quote expires and which assumptions must be reconfirmed.
Keep repeat order assumptions separate from the initial total. Compare the quotes for this year before you estimate any future savings.
If you may need late replacements, ask what the supplier can quote for them. Consider whether you want unmarked spares in the first run.
Trace Costs To The Same Receiving Point
Ask whether engraving is charged per line, per award, or as a setup and unit charge. Confirm the recipient counts it applies to.
If names arrive late, ask for the second engraving run as its own price line. Use the engraving handoff guide to decide who holds the blank awards.
Ask whether sorting by award version is included in packing. If your team will sort them, estimate that work on your comparison sheet.
If a quotation omits assembly, put the missing work on its own line. Use the same standard for both supplier and in-house work.
Choose one receiving address and the same shipment basis before comparing totals. Mark which freight and handoff services each supplier price already includes.
The DHL landed cost guide includes product charges, transportation, insurance and applicable import costs. Put each expense on one line with its payer and source.
Ask the broker which duties, taxes and clearance costs apply at the chosen destination. Mark the estimate date and the shipment assumptions used.
Confirm whether the freight quote covers the final delivery leg and the named dock. Add any receiving charges your team must pay to reach that point.
Compare both quotes in one currency and on the same tax basis. Keep recoverable taxes and any payment charges visible for your finance team.
Use the FedEx landed cost example as a reference when listing charges. Count each included charge once and flag open amounts for confirmation.
Ask who pays for extra changes after artwork approval. Use the medal design guide to identify the approved drawing revision.
Keep the quote estimate and the signed order separate. Before releasing it, confirm quantities, version labels, and the finished parts with the event team.
Calculate Landed Cost Per Usable Award
This landed cost calculation compares two hypothetical quotes for 300 finished awards. Both use dollars and the same final receiving dock.
The order needs 260 standard medals and 40 engraved awards. Both quotes use the same body size and finish for each version.
| Cost Line | Quote A | Quote B |
|---|---|---|
| 260 standard awards | $780 | $728 |
| 40 engraved awards | $200 | $184 |
| Setup | $180 | $250 |
| Pack and sort | Included | $54 |
| Quoted freight | $90 | $80 |
| Insurance | Included | $12 |
| Duties and taxes | $60 | $60 |
| Brokerage | $25 | $24 |
| Final delivery | Included | $55 |
| Dock handling | $15 | $15 |
| Landed total | $1,350 | $1,462 |
Quote A includes insurance and final delivery in its freight line. Quote B needs both added, and each route includes estimated import and dock charges.
At 300 usable awards, A lands at $4.50 per award. B lands at about $4.87 once you add the separately quoted work.

Count The Awards You Can Hand Out
Divide the total at the named dock by the usable award count. For a forecast, use the agreed quantities and document the usable-count assumptions.
Five incorrect engraved names could leave 295 usable awards until corrected. At the same landed total, A would cost about $4.58 per usable award.
Also check the usable counts for each tier. Extra standard medals cannot fill a shortfall in engraved awards assigned to specific people.
Record any correction costs separately when they arise after receipt. Keep the landed total and the additional cost of preparing usable awards visible.
Check What Happens When Award Counts Change
Ask for two totals if the event has a firm count and a higher planning count. Keep the body specification and packing scope identical.
Ask which charges stay fixed when the order quantity changes. Compare the difference in total cost with the number of extra awards delivered.
Suppose the landed total rises by $120 when you add 40 standard medals. In this example, the extra pieces add $3 each on average.
If those 40 pieces are engraved instead, ask for a separate calculation. A quote for extra standard bodies will omit that personalization work.
If the budget needs a lower total, keep the agreed number of awards visible. Ask which options change while preserving that finished quantity.
Ask which quantities trigger an extra carton or a change in packing labor. Note any practical limit on mixing tiers in that carton.
Show the committee one total with optional changes and one with the approved specification. Put the difference beside the items that change.
If a reorder would ship to a different location, ask for a fresh delivery line. Keep that figure separate from the award unit price.
Record which event details are still provisional. Tell suppliers when you expect to confirm the quantities and which quote revision they should use.
A sponsor may fund only a specific award tier. Keep that tier’s quantity and agreed shared charges visible in your event cost sheet.
Ask your event team to agree on the preferred option before you release a purchase order. Attach the signed version schedule to that order.
Give the organiser a comparison sheet they can update after an attendee change. Keep the initial quote beside the revised totals for review.
Check The Final Quote Before Release
Give each award version a row for finished quantity, included parts and separately priced work. Mark whether the supplier or your team owns each open charge. Confirm those lines before releasing the order.
- Confirm the finished count and quoted unit for every award version.
- List shared and version-specific setup charges, including any agreed samples.
- Confirm freight, insurance, import charges, clearance and final delivery through the agreed receiving point.
- Mark the payer and estimate date for any open charge.
- Confirm how the supplier will quote any late changes or extra runs.
- Keep the approved sample codes and quote revision with the order.
Check the combined cost against the event budget after you confirm the award count. Keep any optional extra work outside the approved total.
Review what changes if attendance moves after approval. Assign one person to request the updated quote and authorize any change.
For a school sports day order, check counts by group before confirming the total. An overall quantity can conceal a class shortfall.
Give receiving staff the agreed version counts, packing list and sample references. Ask them to record usable awards separately from items awaiting review.
Frequently Asked Questions
Can One Quote Cover Two Medal Sizes?
Yes, if the supplier lists each size and associated charges. Ask how tooling, packing and delivery differ before comparing the size options.
Should The Example Prices Go Into Our Budget?
Use the example as a calculation template. Ask suppliers to price your actual order before setting the budget.
How Should We Compare Quotes In Different Currencies?
Convert the comparable totals using a consistent rate and record its date. Check any payment charges separately.
What If We Need Several Approval Samples?
Ask which sample costs apply to each version and revision. Confirm whether another sample is needed if engraving or the finished body changes.
Can We Quote An Optional Presentation Box?
List it as a separate option for the intended quantity. Check whether adding it changes packing or delivery charges.
How Do We Include Awards Held As Spares?
State the spare quantity and finish beside each version. Track those pieces separately if your event budget counts only awards assigned to recipients.
Final Thoughts
Bring your award versions, destination and cost assumptions. Explore custom medal options or send your quote brief so you can confirm the charges that apply to your order.