How To Specify An ASTM B117 Salt Spray Test For Bag Hardware
Your supplier quotes an ASTM B117 salt spray test for plated bag hardware. You still need to agree what earns approval.
Define the parts, exposure and acceptance criteria before testing. Use the report to decide which lots can ship.

Confirm Whether Your Order Needs A Test
Start with the retail or brand requirement that calls for a corrosion test. Ask who owns that requirement and who can approve the result.
Give your supplier the finish specification before it prices the work. Identify the initial approval, process change or production release that depends on the report.
A new plated pull may need qualification before your brand commits to production. An existing charm may need a new report after its coating changes.
If the order has no test requirement, bring the expected use and any previous finish failures to your quality lead. Decide whether testing would support a specific approval.
Review visible finish match with your assembled appearance reference. Then agree which corrosion observations matter under the exposure your buyer specifies.
Ask whether the report must cover a first article, each finish lot or a periodic check. Tie the frequency to your actual release decision.
Put sample availability, report delivery and buyer review into the order schedule. Leave enough time to replace an incomplete submission before the planned shipment.
Ask for the testing charge and repeat test terms in the quote. Record who pays and who can authorize another sample set.
Write The Exact Standard And Method
ASTM B117-26a, Standard Practice for Operating Salt Spray (Fog) Apparatus, defines conditions for a controlled salt fog exposure. Your product specification supplies the exposure duration and acceptance criteria.
ISO 9227:2022, Corrosion tests in artificial atmospheres — Salt spray tests, covers three methods. Cite ISO 9227:2022/Amd 1:2024 as well when specifying the current ISO text.
The ISO methods are neutral salt spray, acetic acid salt spray and copper-accelerated acetic acid salt spray. Spell out which one applies on your request.
Copy the standard, edition and applicable method from the customer specification to the test request. Ask the lab to confirm the same details in writing.
If a quote names a different standard, send it to the person who owns the specification. Get written approval before the supplier books the test.
Keep the reported exposure tied to the named method and parts. Treat the hours as conditions for your purchase decision within that defined test.
Use separate evidence when you need an estimate of service life. Ask your technical team what field exposure data would represent the finished product.
Identify And Trace The Actual Specimens
List the plated components by part number and revision, including parts sourced elsewhere. A charm body, mounting ring and zipper pull may have different substrates.
For each part, record the finish code, metal beneath the coating and any specified layers or topcoat. Identify the production and finishing lots where available.

Ask your lab which finished pieces it can mount in the required orientation. Record whether touching parts are tested separately or as a complete assembly.
If you sell the parts joined together, show the lab where they make contact. Agree whether the plan needs evidence from that contact area or from separate components.
If the lab proposes a flat witness sample, ask which actual part it represents. Confirm which features still need evaluation on the finished part.
For a metal zipper pull, name any supplied loop separately from the pull body. Mark the slider as out of scope if another supplier provides it.
Agree the sample count for each part and finish before shipping them. Label each specimen so the lab can connect its images to the correct lot.
Agree What Counts As A Failure
Draw the evaluation areas on a sample photo or diagram. Identify exposed faces, edges, recesses and assembly contacts that matter to your purchase.
Ask the lab how it will handle fixtures, masked areas and surfaces outside the evaluation scope. Keep those decisions with the approved request.
Describe the appearance of each condition you want recorded. Your criteria might distinguish base metal corrosion, blistering, coating lift and an approved change in appearance.
Specify any limit by count, area or severity where the buyer can judge it consistently. A reference photo can help the lab apply that limit.
If a retail buyer sets different limits for a face and a hidden edge, mark both areas on the drawing. Define how to record a defect that crosses their boundary.
| Field | What To Agree |
|---|---|
| Parts | Finished part IDs, substrate, finish revision and lot. |
| Method | Named standard, edition and the applicable method. |
| Exposure | Required duration and any prescribed inspections. |
| Areas | Evaluated faces and edges, plus any exclusions. |
| Limits | Allowed and rejected observations for each area. |
| Decision | Named approver, affected lots and retest rules. |
Confirm whether the lab will state conformity against your criteria or report observations for the buyer to evaluate. Include that responsibility in the quote.
Agree when the lab should inspect and photograph the specimens after exposure. Record any required handling or cleaning before the lab makes that inspection.
Read The Report By Part And Lot
Match the report number and specimen list to your sample submission. Check that the tested finish revision and lot match the stock waiting for release.
Compare the stated method, elapsed exposure and evaluation areas with the order. Ask how any interruption, deviation or missing photograph affects the reported results.
Review every submitted specimen promised in the plan. A report that lists only the passing pieces leaves your buyer without evidence for the full sample set.

Read the observations for each marked area before applying your limit. Ask the lab to clarify an ambiguous spot or identify the affected coating layer.
If a result sits near the limit, ask how the lab evaluated the condition. Leave the affected stock on hold while you obtain the answer.
Keep a report showing the agreed exposure and a sample record showing where each part went. Together they help you trace a mixed assembly.
When the report uses a supplier code, ask for the cross-reference to your purchase order line. Give the receiving or release team that same reference.
Decide Whether To Release The Lot
Suppose a buyer orders a plated bag charm and a separate joining ring. The buyer agrees to a 48-hour ASTM B117-26a exposure for this order.
The order rejects a lot if any sample shows coating lift or visible base metal corrosion on a marked area. The lab submits labeled photos for each specimen.
The buyer requires three production samples per lot. Sample IDs on the photos let receiving staff match the report to each bag of stock.
| Evidence | Buyer Action |
|---|---|
| Body B17 passes | Release this body lot for approved uses once the remaining order checks pass. |
| Ring R06 fails | One ring has base metal corrosion on a marked edge. Reject the ring lot and hold affected assemblies. |
| Ring R07 unverified | Hold this ring lot because the report lacks a batch link to the production stock. |
The exposure and rejection rule in this example belong to one fictional order. Set both from your requirements before committing the purchase.
The approved body can remain available for assembly with a ring lot that has passed. Identify assemblies already made with R06 before releasing any cartons.
Ask the supplier for a replacement plan when a representative specimen fails an agreed criterion. Request a corrected report when the evidence is incomplete.
For R07, ask the lab and supplier to reconcile specimen IDs with their submission records. Send traceable replacements if the originals cannot be linked to the lot.
Keep the final disposition beside the report and order line. Include the approver, date, affected stock and any conditions on partial release.
Set Retest Rules Before The Next Order
Ask the supplier to notify you when the base metal, coating stack, finisher or topcoat changes. Mark which changes require a new sample or test.
Agree on the difference between rerunning an invalid test and testing a corrected production lot. Keep both decisions linked to the prior report and reason.
If the supplier replaces a rejected lot, check the replacement markings before accepting its report. Confirm that the tested pieces represent the stock now offered.
Forward the release conditions to any assembler that receives the pieces before final packing. Ask it to preserve lot identity until the buyer authorizes mixing.
When the issue repeats, use the evidence to request supplier corrective action. Make the proposed correction and its verification visible before the next shipment.
Retain the approved request, report and disposition with the finish revision. Your next buyer can see exactly which parts and conditions that approval covers.
Frequently Asked Questions
Can A Supplier Report Cover Several Finish Codes?
Ask the spec owner to identify which finishes the report covers. Require evidence for additional coating systems before using the report to release them.
Can A Lab Record Results At Several Times?
Ask the lab whether your method and test plan allow interim checks. Agree how it will make and record those observations before it starts.
What If A Fixture Touches An Area We Need To Evaluate?
Ask the lab to review the proposed mounting with your evaluation drawing. Approve a setup that gives the requested area the required exposure.
Can Our Supplier Use An Outside Laboratory?
Check any customer requirements for the lab and scope of testing. Ask who sends specimens and who provides the complete report to your team.
How Do We Handle Stock That Ships Before The Results?
Agree on a hold location and owner before any movement. Keep the stock from further distribution until the buyer makes the documented release decision.
Final Thoughts
Share your component drawings, finish requirements and planned acceptance criteria with our custom metal charms team. Confirm the parts each supplier will provide and the evidence your buyer needs before approving the order.